Send Message
Shanghai Anping Static Technology Co.,Ltd 86-021-6451-7662 journey@sh-anping.com.cn
Long lift Time Ionizer Film Production ESD Control Anti Static Bar

Long lift Time Ionizer Film Production ESD Control Anti Static Bar

  • High Light

    antistatic bar

    ,

    static electricity discharger

  • Discharge Speed
    <2s
  • Ion Balance
    ±15V
  • Power
    5W
  • Input Voltage
    220V/50HZ Or 110V/60HZ
  • Place of Origin
    China
  • Brand Name
    AP&T
  • Certification
    CE
  • Model Number
    AP-DC5703
  • Minimum Order Quantity
    5 pcs
  • Price
    negotiation
  • Packaging Details
    Standard Export Packing (Carton)
  • Delivery Time
    3 to 5 working days
  • Payment Terms
    T/T, Western Union, MoneyGram
  • Supply Ability
    2000 pcs / month

Long lift Time Ionizer Film Production ESD Control Anti Static Bar

AP-DC5703 Installation Screw Removable Antistatic Bar, Long lift Time Ionizer Film Production ESD Control

 

1. Features   

 

Bar shaped and cross over static eliminator

Excellent electrical property data by applying the newest static eliminating technology

Two groups of independent positive and negative high voltage electrode with long lifetime

Stripe shaped notch on the back of the bar for users to fasten the bar with M6 bolt

Working under high voltage and micro current with good safety performance

 

Wildly used in textile, plastic, film and printing industries

 

 

2. Specification

 

Long lift Time Ionizer Film Production ESD Control Anti Static Bar 0

 

 


 

 

3Working Ways(DC)

 

Long lift Time Ionizer Film Production ESD Control Anti Static Bar 1

 

4. Elimination Effect

 

 

Long lift Time Ionizer Film Production ESD Control Anti Static Bar 2

Testing instrument :3M-711 Static tester

Testing standard :SJ/T10694-2006,GB/T14437-97

Testing voltage :±1000 — ±100V Attenuation

Testing environment :Humidity 30%—50%  Temperature 20±5℃

 

 

5. Outline Dimensional Drawing

 

 

Long lift Time Ionizer Film Production ESD Control Anti Static Bar 3

 

6. Positioning

 

 

Long lift Time Ionizer Film Production ESD Control Anti Static Bar 4

 

Long lift Time Ionizer Film Production ESD Control Anti Static Bar 5Long lift Time Ionizer Film Production ESD Control Anti Static Bar 6